Pre-Engineered Steel Buildings

PEB Shed and Pre-Engineered Building Construction

Steel sheds for warehouses, factories and workshops: designed, made in the plant, and put up on your land with all the civil work.

What is a PEB shed?

PEB stands for pre-engineered building. The whole steel building is designed first, its parts are cut, welded and painted in a fabrication plant, and they are then bolted together on the site. Very little steel work is done on the land itself, so the building goes up quickly and to a known quality.

Most new warehouses and factory sheds in India are built this way, because a PEB gives a wide, column-free floor at a lower weight of steel than a conventional steel shed.

What a PEB shed is made of

Main frames

Columns and rafters made of welded steel plates. They are deeper where the load is high and slimmer where it is low, which saves steel.

Purlins and girts

Light, cold-formed steel sections that run between the frames and carry the roof and wall sheets.

Roof and wall sheets

Colour-coated steel sheets. Insulation, skylights and roof ventilators are added as the use of the building needs.

Bracing and anchor bolts

Bracing keeps the building steady in wind and earthquakes. Anchor bolts cast into the foundations hold the frames down.

Add-ons

Crane beams, a mezzanine floor, canopies over the docks, a parapet or a front in glass and panels, when you ask for them.

PEB or a conventional building?

PEB shedConventional steel or concrete
TimeSteel is made in the plant while the foundations are cast, so the two run together.Most work is done on the site, one stage after another.
Clear floorWide spans with few or no columns inside.More columns for the same width.
FoundationsA lighter building, so lighter foundations.Heavier, more concrete in the ground.
Later changesEasy to extend by adding bays. Can be taken down and moved.Hard to extend, cannot be moved.
Best forWarehouses, factory sheds, workshops, showrooms.Buildings with many floors and heavy floor loads.

For a single-storey warehouse or factory, a PEB is nearly always the right choice. The ground work, the floor and the fire system still take their own time, so plan the whole project and not only the steel.

PEB buildings on the ground

Warehouses and industrial sheds in pre-engineered steel:

Pre-engineered steel building at Aurangabad, Bihar, built by Garv Infra
Aurangabad, Bihar
Pre-engineered steel building at Barauni, Bihar, built by Garv Infra
Barauni, Bihar
Pre-engineered steel building at Hajipur, Bihar, built by Garv Infra
Hajipur, Bihar
Pre-engineered steel building at Purulia, West Bengal, built by Garv Infra
Purulia, West Bengal
Pre-engineered steel building at Patna, Bihar, built by Garv Infra
Patna, Bihar
Pre-engineered steel building at Begusarai, Bihar, built by Garv Infra
Begusarai, Bihar

Buildings in these photos were built by our construction associate, Garv Infra Projects Pvt. Ltd. See more of the work, with site films.

Who builds it

Goolshan Logistics builds in association with Garv Infra Projects Pvt. Ltd., a steel building company that has been putting up pre-engineered buildings, with all the civil work, since 2014. You deal with one team at Goolshan Logistics from the first call to handover.

How a PEB project runs

  1. Your requirementLength, width, clear height, crane or no crane, the use of the building, and where the land is.
  2. Design and drawingsThe building is designed for its loads and for the wind and earthquake zone of the site. You get a layout and a quote.
  3. Foundations and civil workExcavation, footings with anchor bolts, plinth and the floor. The steel is being made in the plant at the same time.
  4. ErectionFrames, purlins and bracing are lifted and bolted with cranes, then checked for line and level.
  5. Sheeting and fittingsRoof and wall sheets, skylights, ventilators, gutters, doors and shutters.
  6. HandoverA finished, tested building with its drawings and papers, and help in finding a tenant if you want to lease it out.

What a PEB shed costs

A PEB is priced on the weight of steel and the area of sheeting, so the rate per sq ft moves with the building. The main things that change it:

As a working figure, a complete warehouse in India costs about ₹1,000 to ₹2,000 per sq ft of built-up area to build, without the land. A simple shed is near the lower end and a full Grade A specification near the higher end. The steel building is only one part of this: the land filling, the floor, the docks, the fire system and the electrical work make up the rest.

What the money goes into, with a worked example, is in our guide on GLwarehousez: warehouse construction cost per sq ft in India. For a figure on your own plot and drawing, ask us for a quote.

More on construction

Warehouse construction

See a steel building go up, part by part

From an empty plot to a finished Grade A building: the steel, the roof, the docks and the fire system go up in front of you. Then touch each part to see what it does.

3D view of a warehouse under construction: steel frames, roof sheets going on and a tower crane▶ Live 3D

Questions people ask

What is the full form of PEB?

PEB means pre-engineered building: a steel building that is designed first, made in a fabrication plant and bolted together on the site.

What is the cost of a PEB shed per sq ft?

There is no single rate. It depends on the clear height, the span, cranes, the kind of sheeting, the site and the price of steel. A complete warehouse, with floor, docks, fire system and electricals, usually comes to about ₹1,000 to ₹2,000 per sq ft without the land. We give a written quote on your own drawing.

How long does it take to build a PEB shed?

The steel is made while the foundations are being cast, so a PEB is much faster than a conventional building. The exact time depends on the size, the approvals and the floor and fire work. We give a schedule with the quote.

Is a PEB better than an RCC building?

For a single-storey warehouse, factory shed or workshop, yes: it is faster, gives a clear floor and is easy to extend. For a building with many floors and heavy floor loads, concrete is often the better choice.

Can a PEB shed be extended later?

Yes. If you plan for it at the start, more bays can be added at the end of the building without disturbing the part that is in use.

Do you also do the civil work?

Yes. Land filling, foundations, plinth, floor, roads, drains, docks, the fire system and electricals are done along with the steel building, so you deal with one team.

Which codes is a PEB designed to?

In India the design follows the Indian Standard codes for steel structures and for wind and earthquake loads (IS 800, IS 875 and IS 1893).

Secure Your Industrial Legacy

Partner with Goolshan Logistics for infrastructure solutions that scale with your ambition.

Direct Inquiry

+91 87961 12565

Connect with our advisory board for specialized project needs.

Request a Proposal

support@glwarehousez.com

Experience a streamlined professional onboarding process.